Licensed & Insured 24/7 Emergency Response 5.0 ★ · 23 Google Reviews
Call (954) 204-8769
Edwin Electric lightning-bolt mark Edwin ElectricLicensed Florida electrician
Edwin Electric mark Edwin Electric
NEW CONSTRUCTION · SOUTH FLORIDA

New Construction Electrician for South Florida Builders

Ground-up residential and light commercial. Permit-ready plans, on-time rough-in and trim, clean inspections, tight GC coordination.

What this covers

New Construction Wiring in Broward & Palm Beach

General contractors keep us on the shortlist because we hit dates and pass inspections. We show up at the GC coordination meeting, we do our own permit work, and we don't slow down the drywall crew because our rough-in isn't done. If you're building your own home, that same rhythm applies — with the added benefit that we'll explain every decision in plain English.

What's included

  • Full electrical rough-in for new construction (plans-to-permits-to-power-on)
  • GC coordination — attend the framing walk, meet drywall on schedule
  • Load calculations, panel schedules, service size sizing
  • Interior + exterior lighting design collaboration with your designer
  • Structured wiring: CAT6, coax, HDMI runs, in-wall speaker runs
  • Smart home rough-in (neutrals in every switch box, WAP drops)
  • Fire alarm rough-in coordination for townhomes and multi-family
  • Trim-out, device install, and final inspection

When to call us

You're planning a new home and want an electrical spec

We meet at the plans stage — before the framer starts — so we can catch missing outlets, wrong circuit assignments, and undersized panels before they cost money.

Your last electrician can't hit your framing walk

We can drop in mid-project. Bring us the plans, we'll walk the site, and give you a fixed price on the remaining work.

You're building a duplex or small multi-family

Separate meters, shared risers, common-area circuits — we've done the config a hundred times.

Common questions

Do you work directly with GCs on progress billing?

Yes. Standard schedule of values, monthly draws, lien waivers on demand. We invoice through your GC's preferred format (Procore, PlanGrid, email PDF).

How far in advance should we book you for rough-in?

Ideally as soon as the framer's schedule is set. We hold slots 4-6 weeks out. If you're calling us the week before rough-in, we can usually still make it work — call and we'll be honest about it.

Ready to talk about new construction?

Same crew, same number, same 5-star rating. Call any hour or send the details for a free estimate.

Text us Call now