Licensed & Insured 24/7 Emergency Response 5.0 ★ · 23 Google Reviews
Call (954) 204-8769
Edwin Electric lightning-bolt mark Edwin ElectricLicensed Florida electrician
Edwin Electric mark Edwin Electric
LOW VOLTAGE · SOUTH FLORIDA

Low Voltage & Structured Wiring for Homes and Businesses

CAT6, coax, HDMI, in-wall speaker, security-camera prewire, WAP drops. Labeled, terminated, tested — no rat's nest.

What this covers

Low Voltage Wiring in Broward & Palm Beach

Low-voltage work is where amateur installers make the biggest mess. Unterminated cables curled behind walls, no labels, no test reports, no map of what goes where. Our low-voltage work looks like the panel work — labeled, dressed, and delivered with a wiring diagram you can hand to the next integrator or IT person.

What's included

  • Cat6/Cat6A network cabling to every room (data drops, WAP locations, home office)
  • Coax runs for cable, satellite, over-the-air antenna
  • HDMI-over-ethernet or fiber for in-wall long TV runs
  • In-wall and in-ceiling speaker wire pulls
  • Security camera prewire (Ring Elite, Ubiquiti, Reolink, commercial IP)
  • Doorbell camera and smart-lock wiring
  • Access-point and network-rack rough-in for smart homes
  • Every cable labeled at both ends + a wiring diagram delivered with the project

When to call us

You're building or renovating and want future-proof wiring

Cheapest to pull during rough-in. We drop Cat6, speaker wire, HDMI, and conduit for future runs — you're set for the next decade.

Your Wi-Fi is bad and you want mesh access points

Mesh on wireless backhaul is a workaround; wired backhaul is the real fix. We pull Cat6 to your ideal AP locations.

You're installing a security camera system

Doing it right = PoE cameras with wired ethernet runs. We prewire so the camera install is fast and clean.

Common questions

Can you install the actual equipment too, or just the wiring?

Both. We can terminate to a patch panel, install the WAP, and hand the network to your IT person, or we can do the whole install including AP config and camera setup. Your call.

Do you certify the cabling?

Yes — every Cat6 pull gets a Fluke certifier test report at request. Standard on any commercial job, available on residential for a small fee.

Ready to talk about low voltage?

Same crew, same number, same 5-star rating. Call any hour or send the details for a free estimate.

Text us Call now

Low Voltage Wiring for South Florida Homes and Businesses

Edwin's Electric pulls and certifies Cat6, coax, HDMI, speaker, and security-camera cable across Broward and Palm Beach counties — every run labeled, tested, and documented.

What Drives Low Voltage Costs in Broward and Palm Beach

South Florida's building stock creates specific wiring challenges that affect scope and price. Older concrete-block homes common in cities like Coral Springs, Plantation, and Boynton Beach have solid masonry walls between floors — fishing cable requires more planning and sometimes conduit through the attic or soffit rather than a straight vertical drop. Homes in coastal ZIP codes are subject to Broward County and Palm Beach County permit requirements for any electrical rough-in, including structured wiring on new construction; pulling low voltage under an open-permit remodel is the right time to get it done without a second inspection cycle.

High humidity is a factor year-round. Cables routed through unconditioned attic spaces in South Florida see extreme heat — 140°F or more in summer — which degrades cheaper cable jackets faster than in northern climates. We spec outdoor-rated or plenum-rated cable where it matters so your Cat6 runs aren't compromised in three years.

The biggest cost driver is almost always whether the walls are open or closed. Low voltage pulled during rough-in alongside your electrician's high-voltage work adds relatively little time; retrofit through finished drywall and concrete block is a different scope entirely. We walk the project before quoting so you know exactly what you're getting.

How to Prepare for a Low Voltage Rough-In

The single best thing you can do before a structured wiring project is decide where devices will live — TV walls, access-point locations, camera mounting points, desk positions — before drywall goes up. Moving a Cat6 drop six inches is free when the stud bays are open; it's a drywall patch after close-in.

For security camera prewire, walk the exterior and flag your coverage priorities: driveways, side gates, and entry points are the most common. PoE camera runs need Cat6 from each camera location back to a central NVR or switch location — home runs, not daisy-chains. We map that route during a pre-construction walkthrough so conduit can be stubbed at the right spots.

For home office and Wi-Fi infrastructure, plan for at least two drops per room (one for a device, one for a local switch or AP) and a dedicated home-run to your main network rack or closet. Over-wiring at rough-in is nearly always cheaper than adding drops later, so we typically help clients think one remodel ahead when scoping the cable count.

Common questions

Do I need a permit for low voltage wiring in Broward or Palm Beach County?
It depends on scope and permit type. Low voltage wiring on a new-construction or major remodel typically falls under the open building permit — pulling it during that phase avoids a separate inspection. Standalone structured wiring in an existing finished home may or may not require a permit depending on the municipality. We can tell you what applies to your specific project before work starts.
Can you add Cat6 drops to a house that's already finished — walls closed, tile down?
Yes, though the approach changes. In concrete-block homes common in South Florida, we often route through the attic and drop down interior walls, or use surface-mount raceways where fishing isn't practical. We scope the existing construction before quoting so there are no surprises about how the cable gets from point A to point B.
What's the difference between having you do the wiring versus a cable or AV company?
Low voltage wiring in Florida that's part of a permitted electrical project must be coordinated with a licensed electrical contractor. Beyond licensing, the difference is documentation: we label both ends, deliver a wiring diagram, and can run a Fluke certifier test on Cat6 runs — so whoever configures your network or camera system later isn't guessing what goes where. An unlabeled rat's nest behind a TV wall is the most common complaint we hear from clients inheriting someone else's work.

Get Your Low Voltage Wiring Scoped

Tell us what you're building or fixing and we'll walk the project and quote it clearly — no obligation.

Call (954) 204-8769